Commissioning / Maintenance

Commissioning / Maintenance

From factory pre-verification to final on-site verification,
we complete stable initial operation.

  • We systematically verify functionality and safety through CE·UL-based FAT/SAT procedures.
  • Our engineers respond directly in the initial commissioning stage, and based on operational data analysis, we ensure long-term system stability.

Provided Services

01

Factory Acceptance Test (FAT)

  • We verify functionality and safety of the manufactured systems in advance
    through FAT procedures.
02

Site Acceptance Test (SAT)

  • We perform final integration tests in the actual facility environment
    to validate normal operation.
03

Initial operation support and maintenance

  • We ensure system stability through support during initial operation
    and improvements based on failure history.

Core Strengths

Reliable
Verification processes based on CE·UL
  • We systematically verify functionality and safety
    through FAT/SAT in accordance with international standards.
Reliable
Engineer-direct response system
  • From commissioning to operational support,
    engineers respond directly to secure reliability.
Reliable
Continuous improvement based on operational data
  • We continuously enhance system performance
    by analyzing failure history and logs.