Commissioning / Maintenance
From factory pre-verification to final on-site verification,
we complete stable initial operation.
- We systematically verify functionality and safety through CE·UL-based FAT/SAT procedures.
- Our engineers respond directly in the initial commissioning stage, and based on operational data analysis, we ensure long-term system stability.
Provided Services
01
Factory Acceptance Test (FAT)
- We verify functionality and safety of the manufactured systems in advance
through FAT procedures.
02
Site Acceptance Test (SAT)
- We perform final integration tests in the actual facility environment
to validate normal operation.
03
Initial operation support and maintenance
- We ensure system stability through support during initial operation
and improvements based on failure history.
Core Strengths

Verification processes based on CE·UL
- We systematically verify functionality and safety
through FAT/SAT in accordance with international standards.

Engineer-direct response system
- From commissioning to operational support,
engineers respond directly to secure reliability.

Continuous improvement based on operational data
- We continuously enhance system performance
by analyzing failure history and logs.